Our Standards are Simply Better!

 

Our team at Campbell Custom Homes will help guide you through each step of the building process from floor plans all the way to possession. At Campbell Homes we strive to be the best home builder in Saskatchewan through technology, service and quality. Our team can discuss our standards with you and show you exactly what makes Campbell Custom Homes’ standards better. We encourage you to compare our suggested jasonstandards to other home builders. We want you to have as much confidence in our products, sales and services as we do and we are there to provide you with the necessary support. In the pages to come you will find our suggested standards, we build over and above minimum code, and consider both structural perspectives as well as hidden health and safety concerns. We understand your home is likely your largest investment and it’s your expectation, and ours, that your investment will protect all that is near and dear to you. Campbell Custom Homes is Saskatchewan’s first Holmes Approved Homes builder. We have teamed up with Mike Holmes – Canada’s Most Trusted Contractor – and he stands behind our work…that’s a reputation you can trust!

 

– Jason Campbell, President
Campbell Custom Homes Ltd.

Holmes Approved Homes

mike
Campbell Custom Homes recently teamed up with Mike Holmes – Canada’s most trusted contractor – and became Saskatchewan’s first official Holmes Approved Homes builder. Through this program we are implementing a new standard in home construction, which represents an opportunity for homebuyers to purchase a custom home that meets Mike’s standards. As the first Holmes Approved Homes builder in Saskatchewan, we are committed to building a safer more durable and more sustainable home that incorporates innovative products and materials. The Holmes Approved Homes program is just another reason why our standards are simply better!

Suggested Standard

 

foundation

  • 20″ x 6” concrete footings w/ 2-10 mm rebar
  • 8″ foundation walls
  • 25 MPA concrete basement floor
  • 3 ½” of 30 MPA concrete garage floor with cure & seal
  • Parging above grade
  • Superseal water protection; additional plastic barrier wrap on foundation

framing

  • Manufactured truss- PINKWOOD joists (resists mold, moisture and fire)
  • PINKWOOD in areas of basement framing; PINKWOOD or treated lumber for foundation ladder/window bucks
  • Engineered roof trusses @ 24″ on center
  • Provision for drying vent provided where required
  • 3/4″ T & G – O.S.B. is nailed, glued and screwed
  • Interior walls 2 x 4 spruce studs @ 16″ o.c.
  • Exterior house walls – 2 x 6 spruce studs @ 16″ o.c.
  • Exterior garage walls – 2 x 4 spruce studs @ 16″ o.c.
  • Wall sheathing – 3/8″ O.S.B.
  • Roof sheathing – 7/16” O.S.B.
  • 3/8″ K3 underlay (lino areas only)
  • 3/8″ rough plywood under tile
  • Emercor insulated rim joists
  • 9′ basement ceiling or as per plan
  • Main/2nd level ceilings as per plan

1 exterior-finish

  • Limited warranty on material shingles
  • Choices of Acrylic stucco, Hardie board, vinyl siding & stone as per plan
  • Pre-finished aluminum fascia, soffit, eaves troughs & down spouts
  • Deck ledger
  • Pre-cast concrete front steps as per plan
  • Tin clad maintenance free utility brackets

windows

  • Triple clear pane windows where possible* Energy Star
  • Window grills as per plan
  • Basement windows as per plan
  • White insulated steel exterior doors as per plan
  • Weiser brushed nickel deadbolts for exterior doors, power combination front deadbolt
  • 8′ overhead garage door or as per plan comes with (2) remote door openers

insulation

  • R-20 exterior house walls
  • R-50 blown interior ceilings
  • 6 mil poly CGSB vapor barrier
  • Spray foam insulation in bonus room floors
  • Emercore insulated cantilevers
  • Thermal image of every home

heating

  • Comfort Maker 96% variable speed High-efficient gas furnace or less; area dependant * Energy Star
  • Greentek HRV or central ventilation-area dependent
  • Supply ducts sealed *Energy Star
  • Dryer vented to exterior
  • Flow-Thru Humidifier
  • Furnace duct cleaning prior to possession
2

plumbing

  • Wirsbo water system (Pressure balance system; each plumbing fixture has dedicated water line to eliminate future water leaks & help sustain constant water pressure.)
  • Digital Thermostat, push button timers and dehumidistat * Energy Star
  • Waterline to the fridge
  • Kindred kitchen double stainless steel sink
  • Kohler Pennington top mount sink in bathroom vanities
  • Bathroom pedestal as per plan
  • Kohler Wellworth low flush toilets *Energy Star
  • Kohler Forte chrome single lever kitchen faucet w/ pullout *Energy Star
  • Kohler Forte chrome single lever bathroom faucets *Energy Star
  • Fiberglass shower stall w/ builder’s standard glass door
  • Fiberglass one piece tub/shower as per plan
  • Fiberglass shower w/ chrome trim as per plan
  • Kohler Forte single lever pressure balance valves on tub/showers *Energy Star
  • (2) 3/4″ lawn services
  • 50 US Gallon Gas high efficient hot water heater *Energy Star
  • 3 piece basement rough-in plumbing as per plan
  • Sump pump

electrcal

  • Exterior lighting as per plan
  • Light fixtures as per lighting allowance
  • 100 amp electrical services w/ 60 circuit breaker panel
  • Motion sensor light in pantry
  • Security alarm rough-in
  • Central vacuum rough-in with vac pan; (1) or more outlet(s) as needed
  • Poly pans around exterior insulated electrical outlets/lights
  • Decora switches/plugs as per code/plan
  • (1) Soffit plug with switch in foyer closet
  • (2) exterior weatherproof outlets
  • Ceiling outlet in garage for garage door opener. Opener included.
  • Smoke/carbon monoxide detectors as per code
3

interiorfinish

  • ½” drywall interior walls
  • 5/8″ drywall interior ceilings or 1/2″ ceiling board
  • ½” drywall garage common walls & ceiling
  • Moisture resistant aqua-board in bathrooms
  • Where custom showers are required we use Green E board, Schluter-Ditra waterproofing systems
  • Basement stairwell finished as per plan
  • Textured ceilings except closets
  • MDF closet shelving painted same as walls 1 shelf per closet, 4 shelves in pantry and linen
  • (3) MDF closet shelving w/ sweater tower in master bedroom closet
  • Bostonian 6 panel embossed interior doors/bi-folds as per customer selection
  • Brushed nickel door hardware
  • 4 ¼” MDF painted baseboards
  • 3 ¼” MDF painted casings
  • Rounded corners on walls
  • Nickel bathroom accessories
  • Full width mirrors in bathrooms
  • Builder’s standard stained maple post railing w/ steel spindles as per plan

countertops

  • Medium sized crown mouldings
  • Ample amount of drawers
  • Upgraded Stainless steel handles
  • Shaker or profiled maple
  • Granite kitchen, undermount sink, D wrap arborite bath countertops w/ 4” countertop backsplash
  • Extended countertops on islands for stools where possible

painting

  • Primer coat (2) finish coats of eggshell latex paint as per standard selection – Low VOC
  • Builder‘s standard carpet with 8 lb underlay on main level, 10 lb underlay in basement
  • Builder’s standard tile and hardwood.
4

appliances

  • Builder’s standard dishwasher and over the range re-circulating microwave

health

  • Sites receive yard waste bins and portable toilets
  • Truss clips are installed on trusses to avoid lift
  • PINKWOOD floor joists and PINKWOOD coated lumber in basement areas (fire, mold, and moisture resistance)
  • Alarm with motion sensors roughed in
  • Thermal image of every home
  • Furnace duct cleaning prior to possession
  • Low VOC paints
  • Smoke/carbon monoxide detectors
  • Maintenance free exteriors

sitedevelopment

  • All lots to be leveled and rough graded on completion of construction with soil that was originally stripped from lot when season permits.
  • The homeowner understands that Campbell Custom Homes Ltd. will not be responsible for shoring or supplying or erecting security fencing or hiring security personnel during the construction
  • Drainage problems caused by natural settlement, high water tables or weather conditions, or those caused by alterations done by landscapers or homeowners, as it is the homeowner’s responsibility to maintain the drainage pattern and grade of the lot set by Campbell Custom Homes Ltd.

specific

  • Garage Ceiling is not insulated unless living space is above
5

*Please note: Some pictures used are for illustration purposes only and may not be a typical standard. Please confirm all selections in writing to help eliminate any confusion.

Menu